Answer
Yes, the Array Charging load management system can be rated at 40A, 60A, 80A or 100A TPN or 100A SPN if you only have a single phase supply.
This does mean that there are a reduced amount of EV chargepoints which can be load managed but the total number will still be more than if load management was not used.
Show on pages